ProPunch: Punch list and turnover verification for homes and multi-unit construction.

Walk the home on your phone. ProPunch marks every item, sends failures back to the crew, and gives your client one verified record to sign.

Procore sync, set up with youCompanyCam

Example home: Home 214, Plan 3BR-B. As the home is walked, the items are checked. The caulk at the tub surround fails, with two photos, and goes back to the crew. The crew fixes it, it is re-checked, and the home is verified: 56 items passed first time and 1 failed item fixed.

Walk the unit. The checklist fills as you go.

This is a real walkthrough on a real project, recorded on a phone. Here is the whole job, start to finish.

A real walkthrough, every item checked on screen
  1. Step 1: Walk the unit and say what you see.

    Open the unit on a phone and talk through each room. The phone records the walk.

  2. Step 2: Every item gets a verdict.

    Pass or fail, with the video and photos attached. A failed item goes back to the crew that owns it.

  3. Step 3: The client signs one verified record.

    The PM reviews the unit, the client checks the proof and signs, and the record is kept.

96.5%

of checklist items passed PM review on the first attempt, across 105 units reviewed.

1,500+

verified checkpoints on the record at our beta partner.

Measured at one beta partner (N=1 customer), a multifamily specialty contractor, from live production data, 26 Feb to 10 Jul 2026. Not a multi-customer benchmark.

How the first-pass rate is measured

Methodology: first-pass rate is computed from live production data at our beta partner, a multifamily specialty contractor (N=1 customer), over 26 Feb to 10 Jul 2026. Of 1,549 checklist items that received a project-manager review in that window, excluding items stamped for work completed before ProPunch was adopted, items force-passed and items marked not-applicable, 96.5% were approved on the first review with no rejection or rework, measured from each item’s recorded first-decision field. The figures span 105 reviewed units on one active multi-unit project; they reflect a single beta partner, not a multi-customer benchmark.